2_bottom.jpg
First view of the early construction phase lookinf at the bottom. All the chassis work is home built with aluminum plate, angle, rectangular tube and mostly PEM nuts. Metal cutting circular saw blades in a table saw worked well.

Uploaded by ed.

Viewing Options:

Viewed 1043 times. Last viewed on 2018/01/12 18:00.

album.pl V6.5