New load center
Many of the existing wires were not long enough to reach the new load center. A 2" piece of PVC and a junction box made splicing in the additional wire lengths possible. Two 20A GFI circuits and a system surge suppressor are installed on the load center
Viewing Options:

Viewed 867 times. Last viewed on 2018/06/23 05:36.

album.pl V6.5